- Home
- Corporate information
- History
- Evolution
Evolution
C-BCM (Carter Business Continuity Management) after the Great East Japan Earthquake and C-QIC (Cataler Quality Innovation Challenge) started. Awarded the Deming Prize (2015) and Deming Grand Prize (2018) in recognition of Total Quality Management (TQM). In 2018, the R&D base "ARK Creation Centre" went into full-scale operation.
Company developments
-
2020
-
- January
- Acquired new land for Shimonobe Industrial Park, Iwata City
-
- May
- Installed solar power generation equipment at Headquarters D-Hall and S-Hall, and started power generation
-
- December
- Kakegawa Municipal Administration 15th Anniversary "Collaboration Town Development" Mayor's Commendation
-
-
2019
-
- March
- Certified as a "Kakegawa child-rearing-friendly business establishment" by Kakegawa City
-
- April
- ARK Creation Centre Engine Test Building Catalyst Durability Test Equipment Inauguration Ceremony
-
- May
- Start of "WAKUWAKU Science Class" for children
-
- June
- Opened "Cataler Farm" as part of diversity promotion activities (Kasugai City, Aichi Prefecture)
-
- October
- Received the "Kakegawa Lifelong Heallthy Citizen's Award", an Excellence Award from Kakegawa City
WAKUWAKU Science Class in Tenhama Festa
Cataler Farm (Work Happiness Farm)
Our technology, jointly developed with Aisin Chemical and Toyota Motor Corporation, is adopted as "air purification coating".
-
2018
-
- January
- "Shippei Charcoal", a collaboration product with Iwata City image character, goes on sale. *Sales are currently discontinued.
-
- May
- Started measures against European GDPR
-
- June
- Established CATALER EUROPE CZECH s.r.o. (Cataler Europe Czech / Abbreviation: CEC)
-
- August
- Completion of Kagayaki Dojo (Human Resources Development Facility)
-
- September
- Typhoon No.24 hits (ARK Creation Centre not in operation for 2 days)
Rubella Day Narita Airport Terminal 1 Departure Lobby
ARK Creation Centre opening ceremony
Cataliner departure ceremony (Tenryu Hamanako Railway Kakegawa Station)
37th National Factory Greening Promotion Convention (Ishigaki Memorial Hall)
Deming Grand Prize Award Ceremony (Keidanren Kaikan)
Tsubaki Miki Contract Commemorative Announcement
-
-
2017
-
- March
- S-Hall completed
-
- April
- Completion of "Wild Bird Forest" on Headquarters premises
-
"Wild Bird Forest" (Protection of Biodiversity)
At Cataler, we respect the intention of the first president to "protect existing greenery", and are implementing green space management that retains existing greenery as much as possible. One of these activities is the Wild Bird Forest (Protecting Biodiversity). The bird sanctuary, which is a wooded area with handmade birdhouses and feeders, is home to about 30 species of wild birds. There is also a walking path with recycled wood chips, which is also a place for employees to relax.
-
- May
- 50th Anniversary Celebration held
-
- July
- IATF 16949 Transition Audit (from ISO / TS 16949)
-
* IATF16949 is certification has been acquired by Cataler (Japan), CATALER (THAILAND) CO., LTD, CATALER SOUTH AFRICA (PTY.) LTD, CATALER NORTH AMERICA CORPORATION, Cataler (Wuxi) Automotive Environmental Technology Co., Ltd., PT.CATALER INDONESIA / CATALER INDIA AUTO PARTS PVT. LTD. (As of 2021).
-
- October
- Completion of ARK Creation Centre
-
- December
- ARK Creation Center Engine Test Building Equipment Combustion Ceremony was held
-
- December
- Fire broke out on the 1st floor of the Headquarters Research Building (fire was extinguished within 30 minutes)
50th Anniversary Celebration (Kakegawa City Lifetime Learning Center)
Concluded a comprehensive agreement on city promotion with Kakegawa City
Completion of ARK Creation Centre
-
-
2016
-
- February
- Cataler India (CIN) delivers first product to Hero Co.
-
- April
- Production stopped for 4 days due to the impact of the Kumamoto earthquake
-
- June
- Published Global VISION 2025
-
- July
- Started distribution of e-mail newsletter "Cataler Communication" to suppliers
-
- August
- Participated as a lecturer in the "1st Incandescent Sci-Tech Class" sponsored by the Kakegawa City Board of Education
-
- August
- New R&D Center Groundbreaking Ceremony held / Name decided to be ARK Creation Centre
CIN Motorcycle catalyst, mass production first shipment
ARK Creation Centre Groundbreaking Ceremony
-
-
2015
-
- March
- TV commercial broadcasts started (only Shizuoka prefecture)
-
- April
- BtoC product "Charcoal (Pettan)" goes on sale *Currently no longer available
-
- April
- Started special sponsorship of Kakegawa / Shincha Marathon
-
- April
- Rubella epidemic in-house
-
- June
- Total production of monolith catalysts for automobiles reaches 300 million mark
-
- October
- Certified as Kakegawa Health Promotion Office
-
- November
- Deming Prize Winner (Award Ceremony)
-
- December
- Headquarters D-Hall (Deming Prize Award Commemoration Hall) completed
Volunteer activities at the Kakegawa / Shincha Marathon
Total production of monolith catalysts for automobiles reaches 300 million mark (global)
Deming Prize Award Ceremony
TQM's world-class honor "Deming Prize"
TQM (Total Quality Management) is a systematic activity that contributes to the achievement of corporate objectives by effectively and efficiently operating the whole company so that it can provide quality and services that satisfy customers at an appropriate price. The world's highest-ranked award for TQM is the Deming Prize, which was established in 1951. It is named after the late Dr. William Edwards Deming, who generalized statistical quality control in postwar Japan, and laid the foundation for improving the quality of Japanese products to the highest level in the world. Many companies challenge this award to improve their corporate structure to achieve their business goals, and as of 2019, a total of 257 organizations have received it.
-
-
2014
-
- March
- Established CATALER INDIA AUTO PARTS PVT. LTD. (Cataler India / Abbreviation: CIN)
-
- June
- Seawall construction completed (tsunami countermeasures)
-
- October
- Started mass production of electrocatalysts for fuel cell electric vehicles
-
- October
- Acquired ISO22301 (Business Continuity Management System) certification
-
* ISO22301 certification has been acquired by Cataler (Japan), CATALER (THAILAND) CO., LTD, CATALER SOUTH AFRICA (PTY.) LTD, PT. CATALER INDONESIA (as of 2022).
CIN company established
The FCEV MIRAI (company-owned vehicle) was marketed for the first time in the world
FCEV (Fuel Cell Electric Vehicle)
The FCEV (fuel cell vehicle) is a vehicle that runs by turning a motor using electrical energy generated by the chemical reaction of hydrogen and oxygen in a fuel cell. Just as a gasoline internal combustion engine vehicle refuels at a gas station, a fuel cell vehicle refuels hydrogen at a hydrogen station.
-
-
2013
-
- February
- Concluded "Forest of Hope Partnership Agreement" with Kakegawa City (Disaster Prevention Forest Restoration Project)
-
- February
- Cataler Indonesia (CIC) begins production of motorcycle catalysts
-
- June
- Start of executive officer system and function chief system
-
- November
- Deposit of "Earthquake and Tsunami Countermeasure Fund" to Kakegawa City (No.1)
Afforestation project
Earthquake and tsunami countermeasure donation Presentation ceremony
CIC Started production of motorcycle catalysts
-
-
2012
-
- March
- CCP (Catalytic Component Products, inc.) Liquidation
-
- March
- Concluded a tsunami evacuation facility use agreement with Kakegawa City
-
- April
- Shizuoka Adapt Road Program beautification project started (cleaning around National Highway No.150)
-
- May
- Donated a welfare vehicle to Kakegawa City (45th anniversary commemorative project)
-
- July
- The BCM Room Project started
-
- November
- C-QIC project kick-off
-
C-QIC (Cataler Quality Innovation Challenge)/Activity to improve quality of work)
Based on the concept of "Build-in quality with ownership", in an effort to improve work quality, we are aiming for continuous improvements in "product quality" and "work quality" by "creating standards that do not cause problems", and "devising a mechanism that does not allow problems to recur".
-
- December
- BCP formulation project started
-
C-BCM (Cataler-Business Continuity Management)
Since Headquarters is situated in the epicenter of the Nankai Trough megaquake and along the coast, we are implementing various initiatives. Placing the highest priority on human life and safety, we have established a system that can contribute to the supply of products to customers and the reconstruction of local communities, and we are continuing those efforts.
CCP Grand Opening Ceremony (October 1989)
Disaster countermeasures in collaboration with the government (evacuation stairs)
Mowing Adapt Road
Letter of appreciation from Shizuoka Prefecture Road User Conference
-
-
2011
-
- March-May
- Due to the impact of the Great East Japan Earthquake, production was suspended for a total of 11 days.
-
- April
- Production performance / precious metal loss management system, the Cataler Actual Production System (abbreviation: CAPS), started operation
-
- July-September
- Closed on Thursdays and Fridays due to the impact of the Great East Japan Earthquake
-
- July
- Major Earthquake Countermeasures Committee established
-
- September
- Typhoon No.15 direct hit
-
- October
- Established PT.CATALER INDONESIA (Cataler Indonesia / Abbreviation: CIC)
State of BCM workshop
BCM workshop
In July 2012, the "BCM Room Project" was started, which consisted of top management, general managers, disaster prevention organization leaders, etc., replacing the "Major Earthquake Countermeasures Committee".
Established CIC company (October 2011)
-
-
2010
-
- January
- "Seven Rules for Walking" established
-
"Seven Rules for Walking" (poketenashihokou)
Po: Don't walk with your hands in your pockets
Ke: Don't walk while using a mobile phone (including phone and email)
Te: When walking on stairs, use the handrail (don't run down, don't run up)
Na: Don't cross a road diagonally
Shi: Point and call when crossing a road
Ho: Use walking paths and pedestrian crossings
Kou: Be responsible for your actions (follow the rules) -
- December
- Transferred control of China Ning Xia Feng Yuan Activated Carbon Company Limited (CFA)
November 2001 CFA No.1 activation furnace inauguration ceremony
-